Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
title_8:8.04_sewage_collection_facilities_rules_and_regulations [2011/11/30 19:52] – Res 691 dustin | title_8:8.04_sewage_collection_facilities_rules_and_regulations [2011/12/01 23:11] – 3 typos dustin | ||
---|---|---|---|
Line 139: | Line 139: | ||
==== 8.04.080 Letter of availability. ==== | ==== 8.04.080 Letter of availability. ==== | ||
- | All persons desiring to construct or place any building, mobile home or other structure to be used for human occupancy within the boundaries of the district shall be required to obtain from the districtletter | + | All persons desiring to construct or place any building, mobile home or other structure to be used for human occupancy within the boundaries of the district shall be required to obtain from the district letter |
(Res. 162,1976: Res. 149 § 2.07,1976) | (Res. 162,1976: Res. 149 § 2.07,1976) | ||
Line 164: | Line 164: | ||
==== 8.04.130 Installation. ==== | ==== 8.04.130 Installation. ==== | ||
- | A property owner may install the side sewer on his own property provided he complies with the applicable provisions of this chapter. A side sewer contractor, | + | A property owner may install the side sewer on his own property provided he complies with the applicable provisions of this chapter. A side sewer contractor, |
(Res. 149 § 4.03,1976) | (Res. 149 § 4.03,1976) | ||
Line 212: | Line 212: | ||
==== 8.04.220 Work in rights-of-way--Protection. ==== | ==== 8.04.220 Work in rights-of-way--Protection. ==== | ||
- | Any excavation made by any sewer contractor with the proper authority, in a right-of-way immediately adjacent thereto, shall be protected and guarded by fencing or coveringwith | + | Any excavation made by any sewer contractor with the proper authority, in a right-of-way immediately adjacent thereto, shall be protected and guarded by fencing or covering with proper lights. The protection of the public from the danger of such excavation shall be the responsibility of the sewer contractor; and the contractor shall be liable for any damage caused by his failure to properly protect and guard such excavation as herein required. If the contractor fails to properly protect and guard such excavation as herein required, the district may properly protect and guard such excavation and charge the cost thereof to the sewer contractor, who shall, upon receiving written notice of the amount of such charge, immediately pay the same to the district. |
(Res. 149 § 6.02, 1976) | (Res. 149 § 6.02, 1976) | ||