Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
title_8:8.04_sewage_collection_facilities_rules_and_regulations [2011/11/30 19:52] – Res 691 dustintitle_8:8.04_sewage_collection_facilities_rules_and_regulations [2011/12/01 23:11] – 3 typos dustin
Line 139: Line 139:
 ==== 8.04.080 Letter of availability. ==== ==== 8.04.080 Letter of availability. ====
  
-All persons desiring to construct or place any building, mobile home or other structure to be used for human occupancy within the boundaries of the district shall be required to obtain from the districtletter of "sewer availability" or "sewer non-availability" prior to applying to the county health department for a septic tank permit and/or the county building department for a building permit. Septic tank permits and/or building permits may be issued only after presentation of said letter.+All persons desiring to construct or place any building, mobile home or other structure to be used for human occupancy within the boundaries of the district shall be required to obtain from the district letter of "sewer availability" or "sewer non-availability" prior to applying to the county health department for a septic tank permit and/or the county building department for a building permit. Septic tank permits and/or building permits may be issued only after presentation of said letter.
 (Res. 162,1976: Res. 149 § 2.07,1976) (Res. 162,1976: Res. 149 § 2.07,1976)
  
Line 164: Line 164:
 ==== 8.04.130 Installation. ==== ==== 8.04.130 Installation. ====
  
-A property owner may install the side sewer on his own property provided he complies with the applicable provisions of this chapter. A side sewer contractor, reg-istered in accordance with Section 8.04.200 of this chapter, shall be required for any work on public right-of-way and/or any connection to the main line sewer. Should the owner or occupant choose to employ a bonded side sewer contractor to do the work on this property, such contractor shall obtain the permit in his own name.+A property owner may install the side sewer on his own property provided he complies with the applicable provisions of this chapter. A side sewer contractor, registered in accordance with Section 8.04.200 of this chapter, shall be required for any work on public right-of-way and/or any connection to the main line sewer. Should the owner or occupant choose to employ a bonded side sewer contractor to do the work on this property, such contractor shall obtain the permit in his own name.
 (Res. 149 § 4.03,1976) (Res. 149 § 4.03,1976)
  
Line 212: Line 212:
 ==== 8.04.220 Work in rights-of-way--Protection. ==== ==== 8.04.220 Work in rights-of-way--Protection. ====
  
-Any excavation made by any sewer contractor with the proper authority, in a right-of-way immediately adjacent thereto, shall be protected and guarded by fencing or coveringwith proper lights. The protection of the public from the danger of such excavation shall be the responsibility of the sewer contractor; and the contractor shall be liable for any damage caused by his failure to properly protect and guard such excavation as herein required. If the contractor fails to properly protect and guard such excavation as herein required, the district may properly protect and guard such excavation and charge the cost thereof to the sewer contractor, who shall, upon receiving written notice of the amount of such charge, immediately pay the same to the district.+Any excavation made by any sewer contractor with the proper authority, in a right-of-way immediately adjacent thereto, shall be protected and guarded by fencing or covering with proper lights. The protection of the public from the danger of such excavation shall be the responsibility of the sewer contractor; and the contractor shall be liable for any damage caused by his failure to properly protect and guard such excavation as herein required. If the contractor fails to properly protect and guard such excavation as herein required, the district may properly protect and guard such excavation and charge the cost thereof to the sewer contractor, who shall, upon receiving written notice of the amount of such charge, immediately pay the same to the district.
 (Res. 149 § 6.02, 1976) (Res. 149 § 6.02, 1976)
  
Navigation
Print/export
QR Code
QR Code Chapter 8.04 - SEWAGE COLLECTION FACILITIES RULES AND REGULATIONS (generated for current page)