Both sides previous revisionPrevious revision | Next revisionBoth sides next revision |
title_8:8.04_sewage_collection_facilities_rules_and_regulations [2019/06/21 17:12] – Res 756 (also typo of formaton > formation) dustin | title_8:8.04_sewage_collection_facilities_rules_and_regulations [2019/06/21 17:13] – Res 756 § 7 dustin |
---|
"Standard mains" or "permanent mains" means mains conforming to the standard specifications or the district with respect to methods, materials and/or minimum diameter. | "Standard mains" or "permanent mains" means mains conforming to the standard specifications or the district with respect to methods, materials and/or minimum diameter. |
| |
"Standard specifications" means those standard specifications for sewer system construction which have been adopted by the board of commissioners of the district. Standard specifications are contained in the district's Developer Project Manual, latest edition. | "Standard specifications" means those standard specifications, conditions, and requirements for sewer system construction which have been adopted by the board of commissioners of the District. This term includes standard specifications, conditions, and applicable requirements contained in the District's Developer Project Manual, latest edition. |
| |
"Storm drain" means a public or private drain which carries storm and surface water or drainage effluent from storm plumbing outlets, and other unpolluted water. | "Storm drain" means a public or private drain which carries storm and surface water or drainage effluent from storm plumbing outlets, and other unpolluted water. |
"Wet Weather Period" means the months of October through March, inclusive | "Wet Weather Period" means the months of October through March, inclusive |
| |
(Res. {{:691.pdf|691}} § 1, 2010: Res. {{:617.pdf|617}} § 1, 2002: Res. {{:149.pdf|149}} § 1, 1976) | (Res. {{:756.pdf|756}} § 7, 2019): Res. {{:691.pdf|691}} § 1, 2010: Res. {{:617.pdf|617}} § 1, 2002: Res. {{:149.pdf|149}} § 1, 1976) |
| |
| |