Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| title_2:2.20_small_works_contractors_roster [2011/08/31 16:56] – created dustin | title_2:2.20_small_works_contractors_roster [2011/12/07 17:29] (current) – dustin | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Chapter | + | Renamed to [[title_2:2.20_small_works_roster|Chapter |
| - | + | ||
| - | ==== 2.20.010 Adoption--General procedure. ==== | + | |
| - | The district shall adopt a small works roster which shall be maintained in the district office. The small works roster shall include all responsible contractors who have requested to be on the list. The manager shall set up procedures to notify all contractors on the small works roster of projects the estimated cost of which is less than twenty-five thousand dollars and to obtain written and/or telephone bids. | + | |
| - | (Res. 398 §1, 1983) | + | |
| - | ==== 2.20.020 Basis for selection. ==== | + | |
| - | The commissioners shall select, on the basis of lowest telephone or written bid, qualified contractors to perform projects for the district where the project cost is under twenty-five thousand dollars. | + | |
| - | (Res. 398 §2, 1983) | + | |
| - | ==== 2.20.030 Prequalification of contractors for inclusion. ==== | + | |
| - | The manager shall set up uniform procedures to prequalify contractors for inclusion on the list, and shall advise the contractors in the district of the small works roster. | + | |
| - | (Res. 398 §3, 1983) | + | |
| - | ==== 2.20.040 Revision of roster. ==== | + | |
| - | The small works roster shall be revised every six months. | + | |
| - | (Res. 398 §4, 1983) | + | |
